Showing posts with label Oculo. Show all posts
Showing posts with label Oculo. Show all posts

Thursday, 22 December 2022

Autodesk Fusion 360 for Design & Manufacturing – Exploring the Workspaces!

In my upcoming blogs, I will dive into why Autodesk Fusion 360 is such a disruptive technology on the market and why industry and educational institutions are becoming more interested in what Fusion 360 has to offer.

In this blog, I will explain what Fusion 360 is and introduce the Simulation, Manufacture, Drawing and Electronics Workspace.

So, what is Fusion 360?

Fusion 360 is the first collaborative, cloud-enabled CAD, CAM, CAE, and 3D PCB design platform that allows designers and engineers across the industry to connect, collaborate and ultimately bring products to market faster than before.

The Simulation Workspace

The Fusion 360 Simulation Workspace allows Engineers to perform simulation studies of different FEA concepts on the design models. The following image is an overview of the types of study that can currently be generated:

These tools available in the preliminary design stage allow engineers to perform testing on the products during the design phase to help reduce errors and improve the product’s safety before the manufacturing process starts.

Fusion 360 users also have an advantage where you can import any native CAD file from any CAD package on the market and perform FEA tasks when required. Models can also be simplified in the Fusion Design or Simulation Environments that allow output to other third-party FEA tools that may be used in the design or quality departments, for example, ANYSYS, CFD etc.

The Manufacture Workspace

Fusion 360’s Manufacture Workspace offers the CAM Engineer a comprehensive set of manufacturing setup options for Milling, Turning or Mill/Turn, Cutting, Additive, Inspection and Fabrication type workflows.

The types of toolpath strategies available include 2.5-Axis Machining, 3-Axis machining, 3+2 (5-Axis Positional) Machining and 5-Axis Simultaneous Machining techniques. Recent updates are incorporating high-end machining strategies such as Steep and Shallow finishing found in Autodesk Flagship CAM package PowerMill, including multi-axis capabilities and collision avoidance, strengthening the machining capabilities that Fusion 360 has to offer.


As the associative behaviour of Fusion 360, where changes are made in the Design Environment, is automatically updated and reflected in the Manufacturing environment meaning that CAM related rework to applied toolpath strategies is kept to a minimum and captured with the design change.

Autodesk Fusion 360 offers an excellent machining simulation environment allowing CAM Engineers to simulate their toolpaths. They can check for collisions and gouges. Adjustments can be applied to the toolpath strategy to ensure a high level of safety before generating the NC code required to operate their expensive CNC machinery.



 


Autodesk gives users access to a free online library of generic post processors, machine simulation files and tooling libraries where all the big players in the CNC world are accommodated for. They are constantly updated with the new and required functionality, including new machines and post-processors being added regularly

If you are unable to locate the desired post processor and or machine simulation file, you have two options:

Option 1

Autodesk released instructions on manually creating and manipulating post processors, which can be found on the Post Library Website.

Option 2

Manufacturers can approach highly training Autodesk Partners to take on post-processor development projects to get you up and running with the software by producing working post-processor and machine simulation files to suit your needs.

If you are looking at adopting Fusion 360 for manufacturing, exploring the Post Processor Library is the perfect place to start. Many post processors are available for free. If you find a post relating to your CNC hardware, see if you can replicate the required toolpath strategies created with your current CAM solution?

Symetri offers excellent services to help you explore Fusion’s functionality and see if it is right for you. We can take your models, apply toolpath strategies, and generate test code to see if further alignment is required for a working post-processor. We also offer comprehensive best-in-class training around all the CNC machining capabilities mentioned above.

 

 


Friday, 2 December 2022

Stepnell’s BIM approach for University of Worcester - The digital journey from construction through to facilities management

This blog takes a look at the use of various technologies on a refurbishment and extension project, resulting in gaining maximum insight and value from a Revit 3D model, streamlining workflows, formatting data for direct input from the design models into a Computer Aided Facilities Management (CAFM) system, through to the use of point cloud technology to assist subcontractors, and monitor site progress every step of the way.

 “This has been a completely BIM-driven project and, as all asset data now moves seamlessly into our CAFM system Archibus, it will carry on being so for long into the future. It was a steep curve learning process for all parties as we set out to integrate numerous technologies, while also working up against the many complexities of combining a refurbishment with a new build.

I firmly believe that embracing others’ knowledge for the betterment of the project is key to a successful outcome. Symetri, were the connecting strand in all of this; they knew what solutions and specialist digital skills to bring to bear, when. It’s something they do every day. Now Stepnell can too”

 

Charlotte Brogan, Technical Manager at Stepnell

Meet Stepnell

Stepnell is a complete construction partner, with end-to-end project lifecycle expertise. The company's main objective is to make sure that its customers realise their visions. Clients can feel confident that every aspect of their project will be executed effectively, to the highest standards, and in a collaborative manner thanks to Stepnell's breadth of expertise and holistic approach.

Stepnell is a financially resilient company with over £58 million in net assets and a history spanning over 150 years in the industry. Stepnell's management team is knowledgeable, experienced and commercially responsible.

Stepnell work with a wide range of clients in the public and private sectors. They combine the focus and accessibility of a regional contractor, with a depth of technical competency, professional capability, and national reach, usually associated with far larger construction companies.


Elizabeth Garrett Anderson building - A showcase project laying the ground rules for the future

Stepnell was successful in its tender for a project from the University of Worcester which included transforming the former Worcester News building, a sizeable two and three storey building, constructed in1965, into a first-class facility for the training of health professionals.

The building has been named by the University as the Elizabeth Garrett Anderson building, in honour of the first woman in Britain to qualify as a physician and surgeon.

The project was partly refurbishment and partly a new build; stripping back to shell and core and then building an extension. Planning was essential for the process of capturing the existing structure and integrating it with the new construction, especially in the context of generating point cloud data.

The University team also requested the usage of a reliable Computer Aided Facilities Management (CAFM) system, which calls for data to be reliably populated from the building's maintainable assets. When it came to synchronising the data between the Revit model and the CAFM system against strict parameters, this latter requirement posed a particularly difficult task. There were additional difficulties, which gave Stepnell the chance to create an approach to projects of such complexity, that would later serve as a model for other projects.

To assure adherence to Building Information Modelling (BIM) norms while adapting to the specific requirements the University voiced for its CAFM system, a complete multidisciplinary team of professional technology providers came together.

 STAGE 1: Preparing to succeed

·         Establishing the BIM level 2 framework

BIM was clearly something that the University of Worcester wanted to utilise on the project. They were determined to employ Revit 3D collaborative models and to make sure that all important data to facilities management after handover could be transferred from the Revit model to the CAFM system, Archibus. This system hadn't yet been put in place.

Stepnell included Symetri as its designated BIM partner for information management during the tender stage, and this partnership swiftly grew. The University's Service Development Manager for Estates and Facilities contacted Symetri for advice on the necessary detail and documentation for the BIM Level 2 project as well as for setting up the facilities management system before they could create their specific clarified requirements for Stepnell. These two foundational strands of project preparation got underway in parallel.

The University team was coached by Symetri through all of the crucial BIM requirements, protocols, and associated project planning, and created key documents like the BIM Execution Plan (BEP). Additionally, they showed how workflows would be integrated between the construction stage (and earlier) to facilities management (and beyond).

·         Simplifying the data focus

The University team appointed Service Works Global (‘SWG’—part of the same group as Symetri) under a separate service to the BIM support services. SWG experts in computer aided facilities management, who guided the setup of Archibus to meet the precise requirements of the University around pertinent data and asset information.

To ensure that the parameters were shared, it was necessary to pay attention to the nature of the data and how it was presented in order to match the file data coding with Archibus. This included information like the building code, warranty information, classification codes, and serial numbers.

 

Usually, Construction Operations Building Information Exchange (COBie) data is used for these purposes. However, the University had a specific requirement on the precise fields of information they needed for the maintenance of their CAFM system, thus it was chosen to structure the data in a bespoke manner. The data that is available in the 3D model is also difficult for those who are not necessarily 3D proficient. The fastest path to comprehension is simplicity. For example, asset manuals are now conveniently accessible by having the URL embedded in both the Revit file and Archibus.

Together, Symetri and SWG formatted the data fields and guided population of the information from the design teams and suppliers directly into the database. This collaboration's specific objective was to create a data flow between Archibus and the project models, so that modifications could be done in the model authoring software and then simply exported, sent to the university, and imported into the CAFM system (Archibus). There were regular data-drop dates that necessitated a general ‘health-check’ on the models from Symetri, in order to make sure the information was accurate before pushing to the university. Symetri used Solibri to ensure the data were reliable, correctly assigned, and checked for information quality within the model.

We’re ready

“At this early stage we knew that every aspect of both the BIM parameters for the project and the smart use of data both within and beyond it had been addressed” says Charlotte Brogan, Technical Manager at Stepnell. “The University was up to speed on how to adhere to BIM protocols and were reassured that the team that we had around us in specialist support roles, were giving everybody a lot of confidence”.

STAGE 2: On-site—making the connections between physical and digital

With the CAFM system in place and the BIM direction of travel defined, documents prepared, and all involved parties brought up to speed, it was time to address how what happened on site, would not sit alone as a physical exercise, while information capture and data foundations for facilities management sat in a different digital world.

·        Gaining visibility of the frame

It took a laser scan to display the frame following the strip-out. The intention then was to combine the point cloud data with the 3D models. From the perspective of MEP and structural contractors, this stage was crucial.  For instance, in order to help them build the roof cladding (a gold copper shingle) offsite, the roof cladding suppliers needed to see how the roof looked. For the purpose of detecting clashes, the point cloud was also crucial.

At this point, the next specialist company joined the team. Stepnell was referred by Symetri to 1st Horizons, who specialise in 3D laser scanning among other things. An invaluable lesson was learned at this stage around the specifics of point cloud.

A simple scan will examine every element in its path. Even when these are subsequently meshed, they do not convert into the ‘solid’ elements that Revit requires. The way around this is to commission a ‘Scan To BIM’ that creates a 3D geometric shape compatible with Revit.

 


·         Seeing the site progress - 360° image capture
Going onsite and taking a look at the situation has typically been done to ensure that the model accurately depicts reality. Taking pictures with a camera (or a smartphone camera), uploading them, attaching them, and sending them can take a lot of time.

Oculo builds a 3D walk environment using a hard-hat mounted camera by taking countless continuous photos until the final product closely resembles video footage and can be completely manipulated on-screen (zoom in and out, rotate etc). A key function of Oculo is the ability to import the project clash detected federated model directly into Oculo, which can be used to compare the scans of the physical as-constructed state on site against the design intent models.


“Oculo has really sped up so many tasks that were previously so painstakingly slow”, says Charlotte. “As-built checks are now easy and also deeply detailed, allowing us to compare what is happening on the site directly to the model”.

Charlotte also states that changes can now be made to the design and not onsite, the far more costly alternative.



The outcomes

The Elizabeth Garrett Anderson project got underway on 6th June 2021 and is on track for completion in December 2022. Beyond just finishing the project, it has been a valuable exercise in educating all parties in best practice in digital and physical, and connecting the two together:

  • University of Worcester intends to use its new BIM standards (such as the EIR and the AIR), to define all projects going forward.
  • University of Worcester now has an up and running CAFM system.
  • Data is now formatted for feeding into Archibus from the model.
  • Clarity, collaboration, and contentment—a winning combination.

Would you like to discuss your BIM projects or Construction workflows?

Please get in touch with SYMETRI by emailing us at info@symetri.co.uk or call us on 0345 370 1444.

 

Saturday, 23 July 2022

On-Demand | What's New in Sovelia Vault

Sovelia Vault is an Autodesk Vault Add-in built to enhance Vault workflows and processes, you can automate and control repetitive design tasks.

Take a look at our on-demand webinar to see how Sovelia Vault streamlines your Autodesk Vault use, helping you to automate routines and providing a complete overview of processes.

The webinar covers:

  • What is Sovelia Vault
  • How to automate and control daily work in Autodesk Vault add-in
  • Introduce new key functionalities and features including Watermarking on PDF, DWF files and Model state support for secondary file formats.

Interested in learning more about Sovelia Vault please visit our website or contact us on 0345 370 1444 or email info@symetri.co.uk


Friday, 10 June 2022

AutoCAD training courses “Can I put the area of a room in a table?”

 As an Application Specialist with over 25 years of training Autodesk applications, I have recently noticed there has been a growing interest from delegates attending SYMETRI’s AutoCAD training courses to advance their skills with AutoCAD Beyond the Basics and the AutoCAD Advanced courses.

Why are more learners attending more advanced course?

Over the past months, I asked my students why there has been an increased interest in more advanced AutoCAD training courses.

The most common answers, is that their company has reached a plateau, the safe known workflows are not efficient anymore, many CAD drafting staff have retired and the time has come to refresh and reskill to advance the business to the next level.

I discovered the group dynamic to be extremely exciting in the Beyond the Basics and Advanced course, as I notice long time CAD users look at new features and workflows to adapt and apply to their needs in the design office. Our follow-on courses are very much a hands-on skill building experience.

“Can I put the area of a room in a table”

During these more advanced training courses, I tend to describe features that will streamline a workflow. For example, when I trained a group of delegates from the world of space planning, where they asked: “Can I put the area of a room in a table?” The answer being “yes”, allows us to discover the workflow to achieve this goal.

 First, we looked at the boundary command.



We then picked a point inside a room using the Object type as Polyline.




This created a closed polyline bounding one of the rooms. There is an entry which shows the Area and Length in the properties under Geometry. Using that information, we can populate given cells in a table.

Over in Paper Space we created a simple table to display Room Name, Room Perimeter and Room Area. In that table, we double clicked on the data cell under Room Perimeter and selected field in the Data menu.



Select object on the left field names in the field dialogue box, and then select the polyline. You can select the polyline model line even when you are in Paper Space.

We need Length to describe our room perimeter and Decimal for format.

In Additional Format we used a conversion factor of 0.001 to convert our millimetres unit size to meters for our table entry.

This gave us a value that represented Metres in Length for the perimeter of the room or boundary that we created. This value is dynamic so if you change the boundary, it will update the table field value.


Use the same procedure to extract the area value from the polyline and put in the table.

AutoCAD Training courses

We offer a wide range of AutoCAD Training courses, please visit our website for more information: https://www.symetri.co.uk/training/autocad-training-courses

AutoCAD Essentials - This course covers the essential core topics for working with the AutoCAD software, starting with a few basic tools expanding to more advanced ones. Find out more: https://www.symetri.co.uk/training/training-courses/autocad-essentials

AutoCAD Beyond the Basics - This 2-day course will help you explore more advanced tools and techniques to help you work smarter. Explore the full course content here: https://www.symetri.co.uk/training/training-courses/autocad-beyond-the-basics

AutoCAD Advanced - Customising and managing AutoCAD to suit your design application is a great way to increase your productivity. This course teaches simple but powerful customisation techniques and advanced AutoCAD tools. Explore the full agenda here: https://www.symetri.co.uk/training/training-courses/autocad-advanced

Testimonial:

The course has been really helpful, informative and enjoyable - often training can be boring but Geoff made it easy for us to understand and relevant to the work we are doing. I can't wait to utilize the skills I've learnt & am also looking to book the next course - only if Geoff is teaching!” Natalie W


Wednesday, 23 March 2022

iLogic Parameter Types

It’s logical to consider that the order of the code in your rule can determine whether it needs to be run twice to complete or not, however there is another cause for this that many people are unaware of and that’s what I will cover today.

The different types of Parameters.

There are two different types of Parameters and they both behave differently which can affect the outcome once a rule has run. This first type is the most common parameter- the “double click the name in the rule editor” blue parameter.

This parameter does what it needs to, including updating in the rule if you rename the parameter in your model. This Parameter will hold onto a value, and only change to that value when the rule finishes executing.

This characteristic of the blue parameter can cause problems.

Let’s examine the example below.


If I know Frame_Width is 100 when my rule starts, I expect the code to make the Length of the Horizontal_SHS component 200. But that’s not the case. The reason for that is after changing the Frame_Width to 200, we now know it will hold that value until the rule finishes, then update to 200. As a result, the Frame_width that is used to drive the length of the SHS part is still 100. Running the rule a second time will cause Frame_Width to be the expected 200 and the component will update correctly.

There is a way around this characteristic, and here Parameter type becomes useful.


Enter the Purple and green parameter, technically referred to as a “Dynamic Parameter”. This parameter uses a String indicated by the “Quotation marks” and won’t update on its own if you change the name of the parameter. On the surface they play the same role, however the dynamic Parameter alters the outcome.

If I was to run the same code but using a dynamic parameter instead of the normal blue parameter, we would get the desired result the first time.

The reason for that is a dynamic Parameter forces the parameter to take the new value as soon as its set instead of waiting for the end of the rule. After the first line, Frame_Width will be 200, and as a result the Length of the SHS part will be 200.

If you find your rules need to run twice, check the order of the code in the rule remembering it runs top to bottom followed by what type of parameters are getting the values needed to execute correctly. For tricky cases, combine your checks with the iLogic Logger in my previous Episode.

With each Inventor release, Autodesk adds new features and abilities in iLogic, so if you’ve used it before or considering using it, contact us. We provide various iLogic training from the very basics to more tailored courses to help you get up to speed with iLogic.

 


Thursday, 10 March 2022

Webinar Recording | Autodesk Inventor add-ins – What is available for me?

This webinar recording takes a look at Autodesk Inventor’s complete portfolio, made up of powerful add-ins at hand within the Autodesk Product Design and Manufacturing Collection subscription.

https://www.symetri.co.uk/insights/video-library/autodesk-inventor-add-ins-what-is-available-for-me

The add-ins include:

  • Tolerance Analysis
  • Inventor Nesting
  • Inventor CAM
  • Inventor Nastran
  • Factory Design Utilities

These add-ins are designed to help in supercharging your workflows, driving efficiency and aid  you with getting the most out of your subscription.

By watching the video, you will learn:

  • Which applications are available with your subscription?
  • An introduction to use cases for each add-in
  • Digital Prototyping to save time and money 

For more information, please get in touch with by completing the form on the Autodesk Inventor page. Alternatively, please call us on 0345 370 1444.


What’s New in AutoCAD Electrical 2025

This blog will examine what’s new in AutoCAD Electrical 2025. Automatic Reports Enhancement In AutoCAD Electrical 2025, you can now cre...