It’s not ideal to start manually moving models in Navisworks Manage, especially if the plan is to run some clash tests. No one wants to take responsibility for coordinating models that may result in inaccurate clash detection.

But, sometimes the need to move models is unavoidable and there are some very useful tools in Navisworks Manage to assist with accurate coordination.

So how can you avoid coordination problems?Let’s start with coordinating project models that were originally authored in Revit. The key to this is that all delivery teams involved in a project should be aware of how their individual project models are coordinated within Revit. Hopefully this very important aspect would have been discussed, agreed and documented at an early stage. For many projects authored in Revit means setting up something called “Shared Coordinates” i.e. a common coordinate system shared by all project models. Once all project models are set up to the agreed shared coordinates, utilising this in Navisworks Manage to ensure accurate coordination is quite straight forward. 

Ensuring the accurate coordination of project models is carried through will depend on the way the models are being brought into Navisworks Manage, and there are two possible ways(assuming shared coordinates have been used):
  1. Open a Revit model directly into Navisworks
  2. Export a native Navisworks file from Revit, to be opened in Navisworks

Either of these methods will require the option of “Shared Coordinates” to be selected.
The image below shows the Options Editor within Revit for the export of a native Navisworks Manage file:

And this one shows the Options Editor for the import of a native Revit file:

If the Revit project models are set up with shared coordinates, “Shared” needs to be the option selected in either scenario.

With the Coordinates setting established as Shared, project models appended into Navisworks Manage should be aligned and ready for review.

So, how do you avoid coordination problems if the project models do not originate from Revit or do not share the same coordinate system?

If the project models do not share the same coordinate system, then some intervention may be required to ensure correct coordination. As mentioned previously Navisworks Manage has a range of options that can be used to manipulate the position and orientation of project models to ensure alignment with other project models, and the method used will depend on the project model that needs to be re-positioned:
  1. Units and Transform
  2. Override Transform
  3. Move with the Gizmo
  4. Transform Selected Items
Units and transform  
 

Define a new origin and rotation for the project model so that alignment with existing project models is achieved.

Override Transform
Alter the position of the project model relative to its current position.

Move Gizmo
Use the Move Gizmo, or the extended Transform panel for greater accuracy.

Transform Selected Items
After taking a point to point measurement and selecting the model to be moved, choose Transform Selected Items from the extended Measure panel.

The methodsyou will need to use will depend on the specific situation, but whether you are using Revit models sharing a common coordinate system or if the project models originate from other authoring software, good communication between delivery teams and use of the correct tools and settings can help you avoid coordination problems in Navisworks Manage.

Talk to us about your Navisworks Manage challenges. We offer consultancy services based on your specific needs, so you gain the most out of your time with an Excitech expert. Excitech Consultants come from a wide variety of industry backgrounds, all bringing expertise directly relevant to the architecture, engineering and construction sector and affiliated businesses. This makes them best placed to assist you.



Monday, 15 April 2019

Is There A Simpler Way To Check For Clashes In 3d Design Models?

As part of the overall project delivery process, it is increasingly becoming a requirement to deliver a clash resolved model. Why? Because determining the presence, location and severity of interferences within the digital environment is more simple and cost effective than trying to manage and fix issues as they arise during construction.

With an increased number of design models being created in 3D modelling applications, there are greater opportunities for managing this process in a more controlled environment. Whether you’re a specialist contractor, a lead architect, or a consultant offering a clash detection service, Navisworks Manage and Clash Detective provides you with the tools to check for clashes in your own model, or in a federated model of project files from multiple delivery teams.

Navisworks Manage and Clash Detective produce clash points and automatically generated reports, resulting in more productive review meetings with outcomes more readily reached and definitive calls to action.

Of course, finding clashes and producing reports is only one part of the story. There has to be processes, procedures and outcomeseginternal decisions or defined as contractual requirements.

Whether you are thinking about investing in Navisworks Manage to check your own project models for clashes, your clash detection is carried out by a third-party consultant, or whether you have already invested in Navisworks, there are many things you should be considering:

  • What training courses are available?
  • Is ongoing support available during initial adoption?
  • Are we using Navisworks to its full potential?
  • How do we formulate an effective clash detection strategy?
  • How can we minimise the number of clashes reported?
  • How can we effectively distribute the relevant information?
  • Can someone else run this for us as a service?
  • Are we receiving clash reports to the standard and level we expected?

I am sure you will have many other questions, but whatever your interest, Excitech have a team of experienced Application Specialists and Consultants to offer guidance, training and support.

Whilst the primary interest in Navisworks Manage is Clash Detective, Navisworks Manage also has a wide range of other tools to assist with tasks ranging from marking up views to visualisation, animation and quantification. 

If you are interested in finding out more about Clash Detection using Navisworks Manage or any of the topics raised here, then contact your Excitech Account Manager or visit our website to see training courses involving the use of Navisworks Manage and Clash Detective at:

What’s New in AutoCAD Electrical 2025

This blog will examine what’s new in AutoCAD Electrical 2025. Automatic Reports Enhancement In AutoCAD Electrical 2025, you can now cre...